A 15 kWh battery at 22,500 lei plus a hybrid inverter with installation at 8,000 lei. Project 30,500 lei. AFM pays 15,000 lei, you put in 15,500 — more than you asked for, so 35 p. Total 100 p.
Casa Verde Baterii 2026
Individuals apply in the AFM app between 20 November at 10:00 and 25 November at 23:59. The score follows Order 1904 of 11 September 2026 from the Ministry of the Environment, Waters and Forests (Official Gazette no. 775 of 14 September 2026), as amended by Order 2.314/2026 (Official Gazette no. 953 of 16 November 2026).
Three criteria decide eligibility:
- Your own contribution — 35 p
- Battery capacity (15 kWh minimum) — 40 p
- No previous public funding for a battery — 25 p
If you are a prosumer, you can receive 15,000 RON of state funding.
↓ Download the funding guide (PDF) The guide approved by OM 1904/2026, published in the Official Gazette on 14 September 2026, converted by us for easy reading. Read it together with the amending order below, which rewrites the scoring.
↓ Download the amending order (PDF) OM 2.314/2026, in Official Gazette no. 953 of 16 November 2026 — the order is on pages 5–6. The official source remains afm.ro.
up to 15,000 lei · min. 10 kWh · 1,500 lei/kWh
AFM funding — at most 75% of the total project value, VAT included.
- An individual who already holds prosumer status
- A photovoltaic system already connected to the grid
- Own contribution of at least 25% of the project value
- A new lithium battery (no lead-acid), with a BMS — at least a 5-year warranty and 5,000 cycles
Where things stand
The funding guide was published in the Official Gazette on 14 September 2026 and amended by Order 2.314/2026, published on 16 November 2026 — the scoring grid on this page is the one in force. Enrolment for individuals: 20–25 November 2026, in the AFM application.
- You hold prosumer status
- You do not use the electricity at the consumption and production point served by the storage system for economic or professional activity; where such activity does take place at the site, its electricity consumption is metered separately from household use
- You have no outstanding obligations to the state budget or to the local budget of the administrative unit where you are domiciled and, where applicable, of the one where the project is implemented
What is filed, and by whom
When you apply — you upload these in the AFM application art. 18
- The funding application — downloaded from the platform, typed in (not handwritten) and uploaded unsigned
- Your identity document, valid on the day you register
- The tax clearance certificate for obligations to the state budget (ANAF)
- The tax clearance certificate from the local budget of your home locality
- A second local tax certificate, if the project is carried out at an address other than your home (for the locality of implementation)
- The prosumer contract, in the applicant's name
- The grid connection certificate for the same consumption point
- An electricity bill in the applicant's name, for the same consumption point, no older than 6 months (relaxed from 3 months in the draft)
At settlement — the validated installer submits these art. 26
- The settlement request, digitally signed by the installer
- The list of beneficiaries, generated from the application: the amount claimed, the updated connection certificate, the kWh
- The invoice issued by the installer — showing the AFM part, your contribution and the ineligible costs separately
- The updated connection certificate, with the battery included; its number and date must match those on the invoice exactly
Documents issued electronically (the tax certificates, the energy invoice) are uploaded exactly in the format received — not scanned, not photographed. AFM pays the installer within 60 days of a complete claim.
How the score is calculated
Three criteria, 100 points at most. The contribution is not scored in lei but as a ratio: what you put in against what you ask AFM for. Between the thresholds the score rises proportionally, not in steps.
| 33% of what you ask AFM for | 10 p |
|---|---|
| 50% | 16.3 p |
| 67% | 22.5 p |
| 83% | 28.8 p |
| 100% or more | 35 p |
| 10 kWh | 20 p |
|---|---|
| 11 kWh | 24 p |
| 12 kWh | 28 p |
| 13 kWh | 32 p |
| 14 kWh | 36 p |
| 15 kWh or more | 40 p |
C. History 25 p
You have never received public money for a battery: 25 p. You have: 0 p — but you stay eligible and may apply for a new battery. Panels taken through Casa Verde Fotovoltaice do not count here.
Tell us what system you have
A few short questions. We show you only what will work on your system — and why the rest will not, so you do not ask for a quote that cannot be installed.
Are you a prosumer?
A prosumer has a connection certificate and a prosumer contract — the system is connected to the grid and can feed the surplus into it.
A maximum of 100 points, from three criteria declared at application:
- Own contribution35 p once you put in at least what you ask AFM for; below that, pro rata max. 35 p
- Storage capacity4 × kWh − 20 — the cap is reached at 15 kWh max. 40 p
- First public grant25 p if you have not taken public money for storage before, 0 if you have max. 25 p
The capacity, the contribution and any public funding received before are declared at application and decide the score; the system installed has to match the declared figures exactly. Which is why it is worth talking before you fill the application in.
Work out your score
The three criteria that decide your eligibility are: the capacity of the battery you choose, your own contribution, and whether you have had public funding for storage before. Move the sliders and see where you stand.
Computed under Order 1904 of 11 September 2026 from the Ministry of the Environment, Waters and Forests (Official Gazette no. 775 of 14 September 2026), as amended by Order 2.314/2026 (Official Gazette no. 953 of 16 November 2026).
Below 20,000 lei you are not using the whole grant: AFM pays only 75% of the project.
Above 15 kWh, capacity earns no further points.
The funding is capped at 15,000 lei, so your contribution ends up larger than the share you chose.
You have the maximum contribution score — it is reached at 15,000 lei of your own. Beyond that, more money earns no more points.
Without the 25 first-grant points, the most you can reach is 75. It does not make you ineligible, but it puts you behind those who have not taken one.
An indicative simulation, assuming all costs are eligible. Selection runs down the score order, within the session budget.
The project that scores 100
This is what a dossier that gets funded looks like.
A hybrid inverter raises your score, not just your bill
The hybrid inverter and its installation count towards the project value but AFM does not pay for them — they are ineligible costs. They stay on your side, and that is exactly what lifts the ratio of contribution to funding, and so stay with you and are invoiced separately from the battery.
15 kWh at 18,000 lei total: take everything AFM allows, 75% or 13,500 lei, and you are left with 4,500 — a third of what you asked for → 10 p. Total 75 p, for the same battery.
You declare the contribution, so you choose how much you ask for. On that same 18,000 lei project, put in 9,000 and ask for 9,000: the ratio is 1 to 1 → 35 p instead of 10, for 4,500 lei more. The rule is simple — full marks when you put in at least what you ask for, which is half the project. Careful: the declared sum becomes binding at settlement.
Four projects, four scores
All figures include VAT. AFM pays the smallest of: 75% of the project, 15,000 lei, and 1,500 lei × kWh.
10 kWh battery, 20,000 lei project
AFM: 15,000 lei (75% = 15,000; 1,500 × 10 = 15,000)
Your contribution: 5,000 lei — a third of what you asked for
12 kWh battery, 24,000 lei project
AFM: 15,000 lei (the ceiling)
Your contribution: 9,000 lei — 60% of what you asked for
16 kWh battery + hybrid inverter, 31,000 lei project
AFM: 15,000 lei (the inverter and its installation, 9,000 lei, are not eligible)
Your contribution: 16,000 lei — more than you asked for
15 kWh battery, but you have had a funded battery before
AFM: 15,000 lei · 30,000 lei project
Your contribution: 15,000 lei — exactly what you asked for
At the same score, the time you applied is the last criterion — not the first
The session budget will run out on some particular score, and dozens of dossiers will sit on exactly that total. Who gets in and who does not is settled there by two things you decide yourself, before you apply.
Your own contribution
The first criterion applied. The larger declared contribution wins — 15,500 lei beats 15,000 lei, even if the other applied days earlier.
Past full marks the extra money earns no points, but here it still works for you.
The battery capacity
The second criterion, if the first did not settle it. A 16 kWh battery beats a 15 kWh one at the same score.
Above 15 kWh the score stops rising, but it stays the argument that puts you ahead.
If neither settles it, next comes whoever has not had public money for storage before and, only at the very end, the date and time of application.
It is not click speed that decides, but how the project is built: the battery capacity and the declared contribution.
Watch out at settlement
- The contribution and kWh declared when you apply are checked against the invoices. They may be larger, never smaller — otherwise AFM pays nothing.
- The battery is bought after approval, not before. AFM pays no advance: it pays the installer after installation.
- Once the list is published you have 90 days to choose a validated installer. Settlement happens within 24 months.
The six steps of the programme
-
01
The quote
We choose the battery (10 kWh minimum, ideally 15 kWh) and, if needed, the hybrid inverter. The quote sets the contribution you declare.
-
02
The application
20–25 November, in the AFM application: the form, your ID, the tax certificates, proof that you are a prosumer. You declare the contribution and the kWh.
-
03
The approved list
The application computes the score and approves dossiers in order, within the budget.
-
04
The installer
Within 90 days you choose an installer validated in the application. Only now can the battery be bought.
-
05
Installation
Delivery, installation, commissioning. The invoice shows the AFM part, your contribution and the inverter separately.
-
06
Settlement
The installer claims the money from AFM (within 24 months). You pay only your contribution and the ineligible part.
Where things stand
-
01
The funding guide was published in the Official Gazette on 14 September 2026 — it is the act in force
-
02
On 16 November 2026 Order 2.314/2026 was published in Official Gazette no. 953, amending the guide: the own contribution is scored as a ratio against the sum asked of AFM, and public funding received earlier becomes a 25-point criterion. It is in force
-
03
Installer validation session: 16–20 November 2026
-
04
Applications from individuals: 20 November, 10:00 — 25 November, 23:59, in the AFM app. The dossier is prepared beforehand, not during the session
-
05
The programme budget is 400 million lei. Applications are approved in score order, until the money runs out
Sources: the funding guide approved by OM 1904/2026, as amended by OM 2.314/2026 (Official Gazette no. 953 of 16 November 2026); the session calendar per the AFM announcement.
Our Casa Verde Baterii packages
All-in prices: VAT, installation, consumables and the prosumer file included. Managed live — what you see here is what we offer today.
| Who pays what | Points | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Package | kWh | Total lei | Ineligible | Scenario | AFM pays | You pay | Contrib. | Capacity | History | Total |
| CV26 20kWh Sungrow Trifazat | 15 | 49,000 | 0 | most grant and top score | 15,000 15.000 lei | 34,00069.4% | 35 | 40 | 25 | 100 |
| CV26 64kWh Steltec | 64.28 | 45,000 | 0 | most grant and top score | 15,000 15.000 lei | 30,00066.7% | 35 | 40 | 25 | 100 |
| CV26 32kWh@18kW Hailei, Solis Trifazat | 32.16 | 39,700 | 12,618 | most grant and top score | 15,000 15.000 lei | 24,70062.2% | 35 | 40 | 25 | 100 |
| CV26 32kWh@15kW Hailei, Solis Trifazat | 32.16 | 39,000 | 12,054 | most grant and top score | 15,000 15.000 lei | 24,00061.5% | 35 | 40 | 25 | 100 |
| CV26 20,7kWh Huawei Luna S1 | 20.7 | 38,000 | 0 | most grant and top score | 15,000 15.000 lei | 23,00060.5% | 35 | 40 | 25 | 100 |
| CV26 15kWh Sungrow Trifazat | 15 | 38,000 | 0 | most grant and top score | 15,000 15.000 lei | 23,00060.5% | 35 | 40 | 25 | 100 |
| CV26 32kWh@8kW Hailei, Solis Trifazat | 32.16 | 35,000 | 11,062 | most grant and top score | 15,000 15.000 lei | 20,00057.1% | 35 | 40 | 25 | 100 |
| CV26 48kWh Hailei | 48.24 | 34,000 | 0 | most grant and top score | 15,000 15.000 lei | 19,00055.9% | 35 | 40 | 25 | 100 |
| CV26 16,9kWh Huawei Luna S1 | 16.9 | 34,000 | 0 | most grant and top score | 15,000 15.000 lei | 19,00055.9% | 35 | 40 | 25 | 100 |
| CV26 21,06kWh@6kW Fox HV Monofazat | 21.06 | 33,000 | 5,713 | most grant and top score | 15,000 15.000 lei | 18,00054.5% | 35 | 40 | 25 | 100 |
| CV26 15kWh Huawei Luna S1 | 15 | 33,000 | 0 | most grant and top score | 15,000 15.000 lei | 18,00054.5% | 35 | 40 | 25 | 100 |
| CV26 20kWh Sungrow Monofazat | 20.48 | 32,800 | 0 | most grant and top score | 15,000 15.000 lei | 17,80054.3% | 35 | 40 | 25 | 100 |
| CV26 36,84kWh Steltec | 36.84 | 31,000 | 0 | most grant and top score | 15,000 15.000 lei | 16,00051.6% | 35 | 40 | 25 | 100 |
| CV26 32kWh@6kW Hailei, Solis Monofazat | 32.16 | 31,000 | 4,753 | most grant and top score | 15,000 15.000 lei | 16,00051.6% | 35 | 40 | 25 | 100 |
| CV26 21,06kWh@8kW Fox HV Trifazat | 21.06 | 31,000 | 0 | most grant and top score | 15,000 15.000 lei | 16,00051.6% | 35 | 40 | 25 | 100 |
| CV26 20,48kWh@5kW Livoltek AC Coupled Monofazat | 20.48 | 30,500 | 0 | most grant and top score | 15,000 15.000 lei | 15,50050.8% | 35 | 40 | 25 | 100 |
| CV26 16kWh@18kW Hailei, Solis Trifazat | 16.08 | 28,600 | 13,174 | most grant | 15,000 15.000 lei | 13,60047.6% | 31.5 | 40 | 25 | 96.5 |
| top score | 14,300 | 14,30050% | 35 | 40 | 25 | 100 | ||||
| CV26 13.8kWh Huawei Luna S1 | 13.8 | 31,000 | 0 | most grant and top score | 15,000 15.000 lei | 16,00051.6% | 35 | 35.2 | 25 | 95.2 |
| CV26 16kWh@15kW Hailei, Solis Trifazat | 16.08 | 28,000 | 12,604 | most grant | 15,000 15.000 lei | 13,00046.4% | 30 | 40 | 25 | 95 |
| top score | 14,000 | 14,00050% | 35 | 40 | 25 | 100 | ||||
| CV26 32kWh Steltec | 32.14 | 25,600 | 0 | most grant | 15,000 15.000 lei | 10,60041.4% | 24 | 40 | 25 | 89 |
| top score | 12,800 | 12,80050% | 35 | 40 | 25 | 100 | ||||
| CV26 16kWh@8kW Hailei, Solis Trifazat | 16.08 | 24,900 | 10,157 | most grant | 14,743 eligibile | 10,15740.8% | 23.3 | 40 | 25 | 88.3 |
| top score | 12,450 | 12,45050% | 35 | 40 | 25 | 100 | ||||
| CV26 15,36kWh@5kW Livoltek AC Coupled Monofazat | 15.36 | 25,000 | 0 | most grant | 15,000 15.000 lei | 10,00040% | 22.5 | 40 | 25 | 87.5 |
| top score | 12,500 | 12,50050% | 35 | 40 | 25 | 100 | ||||
| CV26 15kWh Sungrow Monofazat | 15.36 | 25,000 | 0 | most grant | 15,000 15.000 lei | 10,00040% | 22.5 | 40 | 25 | 87.5 |
| top score | 12,500 | 12,50050% | 35 | 40 | 25 | 100 | ||||
| CV26 15kWh@5kW Livoltek All in One Monofazat | 15.36 | 25,000 | 0 | most grant | 15,000 15.000 lei | 10,00040% | 22.5 | 40 | 25 | 87.5 |
| top score | 12,500 | 12,50050% | 35 | 40 | 25 | 100 | ||||
| CV26 24.56kWh Fox HV Monofazat | 14.04 | 18,000 | 7,760 | most grant | 10,240 eligibile | 7,76043.1% | 25.9 | 36.2 | 25 | 87.1 |
| top score | 9,000 | 9,00050% | 35 | 36.2 | 25 | 96.2 | ||||
| CV26 32kWh Hailei | 32.16 | 24,600 | 0 | most grant | 15,000 15.000 lei | 9,60039% | 21.5 | 40 | 25 | 86.5 |
| top score | 12,300 | 12,30050% | 35 | 40 | 25 | 100 | ||||
| CV26 24.56kWh Steltec | 24.56 | 22,500 | 0 | most grant | 15,000 15.000 lei | 7,50033.3% | 16.3 | 40 | 25 | 81.3 |
| top score | 11,250 | 11,25050% | 35 | 40 | 25 | 100 | ||||
| CV26 10kWh Sungrow Trifazat | 10 | 29,000 | 0 | most grant | 15,000 15.000 lei | 14,00048.3% | 32.5 | 20 | 25 | 77.5 |
| top score | 14,500 | 14,50050% | 35 | 20 | 25 | 80 | ||||
| CV26 16kWh@6kW Hailei, Solis Monofazat | 16.08 | 20,000 | 5,108 | most grant | 14,892 eligibile | 5,10825.5% | 10.4 | 40 | 25 | 75.4 |
| top score | 10,000 | 10,00050% | 35 | 40 | 25 | 100 | ||||
| CV26 10kWh Huawei Luna S1 | 10 | 28,000 | 0 | most grant | 15,000 15.000 lei | 13,00046.4% | 30 | 20 | 25 | 75 |
| top score | 14,000 | 14,00050% | 35 | 20 | 25 | 80 | ||||
| CV26 16kWh Steltec | 16.07 | 14,500 | 0 | most grant | 10,875 75% din total | 3,62525% | 10 | 40 | 25 | 75 |
| top score | 7,250 | 7,25050% | 35 | 40 | 25 | 100 | ||||
| CV26 16kWh Hailei | 16.08 | 13,500 | 0 | most grant | 10,125 75% din total | 3,37525% | 10 | 40 | 25 | 75 |
| top score | 6,750 | 6,75050% | 35 | 40 | 25 | 100 | ||||
| CV26 10,24kWh@5kW Livoltek AC Coupled Monofazat | 10.24 | 19,500 | 0 | most grant | 14,625 75% din total | 4,87525% | 10 | 21 | 25 | 56 |
| top score | 9,750 | 9,75050% | 35 | 21 | 25 | 81 | ||||
| CV26 10kWh Sungrow Monofazat | 10.24 | 18,000 | 0 | most grant | 13,500 75% din total | 4,50025% | 10 | 21 | 25 | 56 |
| top score | 9,000 | 9,00050% | 35 | 21 | 25 | 81 | ||||
The table scrolls sideways — there are more columns to the right.
Where the two scenarios differ, the package appears on two rows: "most grant" — you take as much from AFM as the rules allow, pay less and score less; "top score" — you put in at least what you ask AFM for and reach 100. The difference between the two rows is exactly the decision you have to make.
The scores follow the grid in OM 2.314/2026, published in Official Gazette no. 953 of 16 November 2026. The 25 "first grant" points assume you have not received public money for a storage system before — if you have, take 25 off every total.
The amount AFM pays differs between packages because the inverter, where the package includes one, is an ineligible cost: the funding stops at the eligible expenses even when the 15,000 lei ceiling has not been reached.
Prices include installation, consumables, the prosumer file and 21% VAT. They are indicative and may differ by the time of installation.
Connecting backup consumers is not included in the price.
The contribution you declare when you apply becomes binding at settlement (art. 26 (10)): if you declare 15,000 lei to reach the top score, that is what you have to pay, even if the final project comes out cheaper.
Funding figures correspond to the maximum-score scenario (own contribution at least the sum asked of AFM, capacity ≥15 kWh) under OM 1904/2026 as amended by OM 2.314/2026 (Official Gazette no. 953 of 16 November 2026). Funding is granted within the session budget, in order of score.
Tell us what you have and we will quote it
Tell us which inverter you have and how much you want to put in, and we send you the quote and the exact list of documents. The session opens on 20 November — the file is prepared before it, not during it.